- Project Status: Completed
- Location: Trafford City
- Client: Trafford Golf Centre
- Contact: JCT D&B 2011
- Completion: January 2016
- Architect: Cube
"Russell WBHO employs a ‘one-team’ collaborative approach, bringing together in-house expertise, sub-contractors, suppliers, partner professionals, our clients and their representatives to deliver consistently successful projects."
The Challenge
The main challenge of the project was to ensure the driving range and golf shop remained open throughout the construction period.
Trafford Golf Centre
Trafford Golf Centre
Revamp and extension of customer and staff facilities at the Trafford Golf Centre for Peel Holdings
Coordination of operations was vital and communication was key to minimising disruption during the project. Close relationships were built with the managers of the driving range and golf shop and regular co-ordination meetings were held on site.
Plans were also implemented to allow for the maximum number of driving bays to be kept open during the works.
- Refurbishment and extension of the golf driving range
- Formation of a new entrance, reception area and store room
- Extension works comprising a new café, break out area and manager’s office
- Included the fit out of the reception and café areas
- 100% Design co-ordination
Gallery
(11 Images)
ALSO IN CASE STUDIES:
RETAIL & LEISURE
New Century Hall
- Client: NOMA
- Location: Miller Street, Manchester
-
X
- Location: Miller Street, Manchester
- Architect: Shepherd Robson
- Engineer: Healey Consulting
Chatham Waters
- Client: Peel Holdings
- Location: Gillingham, Kent
-
X
- Location: Gillingham, Kent
- Completion: Summer 2021
Asda, Broadheath
- Client: Property Alliance Group
- Location: Altrincham
-
X
- Location: Altrincham
- Contract: JCT 2011 Design & Build
- Completion: July 2015
- Architect: The Harris Partnership
- Engineer: Healey Consulting
- M&E: BCM Ltd
White City Retail Park Phase 1&2
- Client: Derwent Holdings
- Location: Old Trafford, Manchester
-
X
- Location: Old Trafford, Manchester
- Contract: JCT2011 Design & Build with Amendments
- Completion: July 2015
- Architect: AEW Architects
- Engineer: WML Consulting
- M&E: Tace