- Project Status: Completed
- Location: 5 Kingsland Grange, Warrington
- Client: FedEX
- Contract: JCT Design & Build 2011
- Completion: July 2014
- Architect: APL Architecture
"Russell WBHO employs a ‘one-team’ collaborative approach, bringing together in-house expertise, sub-contractors, suppliers, partner professionals, our clients and their representatives to deliver consistently successful projects."
The Challenge
The building was a dilapidated 24,000 sq. ft industrial building. From the initial concept the cladding and brickworks was removed, to the take the building back to a steel frame.
Fedex
Fedex
Design & Build of new 34,000 sq. ft distribution facility
The existing structure was then extended vertically taking the rafters from a height of 5.0M to 8.5M. The building was also extended with a 10,000 sq. ft extension warehouse space. A new air conditioned external office was constructed on the front elevation. All yards and car parks were taken up, crushed, extended and relaid with new drainage.
Russell WBHO advised on the land acquisition, design concept, planning and completed the build within a 7 month period.
Gallery
(11 Images)
ALSO IN PROJECTS:
INDUSTRIAL
Joy Global
- Client: Joy Global
- Location: Logistics North Site, Bolton
-
X
- Location: Logistics North Site, Bolton
- Contract: JCT Design & Build 2011
- Completion: July 2014
- Architect: APL Architecture
- Engineer: Healey Consulting
Baildon Business Park
- Client: Pendle Russells Ltd
- Location: Otley Road, Baildon nr Bradford
-
X
- Location: Otley Road, Baildon nr Bradford
- Contract: JCT Design & Build Contract 2011
- Completion: July 2019
- Architect: AEW Architects
- Engineer: Paul Waite Associates, Compass Energy Ltd
Heywood Industrial Park
- Client: Harbert Management
- Location: Heywood
-
X
- Location: Heywood
- Contract: JCT Design & Build 2011
- Completion: March 2016
- Architect: Michael Sparks Architects
- Engineer: Healey Consulting
- M&E: Shepherd Brombley Partnership