- Project Status: Completed
- Location: Crosshall Street, Liverpool
- Client: Vita Student Living
- Contract: Unamended JCT 2011 Design & Build
- Completion: October 2013
- Architect: Neil Collins Homes
The Challenge
A technically-challenging three phase scheme to bring back into use 120,000 sq ft across three buildings in Liverpool city centre. Vita Student offers 357 high specification rooms in the Grade II-listed Chapel the 1878 Crosshalls and 1960s Tinlings buildings, all located on a busy city centre street.
The Chapel
The Chapel
The Chapel – 68 Apartments
Full internal structural demolition leaving only the external façade. External façade to be retained using an internal bracing system. Piles to be installed as foundations. Structural steel frame to be erected internal to the retained facades. Metal deck intermediate floors. All facades are to be refurbished and retained as existing to be kept in keeping with the original structure.
Gallery
(11 Images)
ALSO IN CASE STUDIES:
HOTEL & ACCOMMODATION
3 St Peters Square
- Client: Property Alliance Group
- Location: Manchester
-
X
- Location: Manchester
- Contract: JCT Design and Build 2011 with Contract Amendments
- Architect: Stephenson Studio and Leach Rhodes Walker
- Engineer: WSP
Circle Square
- Client: Bruntwood Sci Tech
- Location: Manchester
-
X
- Location: Manchester
- Contract: JCT 2011(Without quantities)
- Completion: September 2020
- Architect: Fielden Clegg Bradley / Leach Rhodes Walker
- Engineer: Tier Consulting
- M&E: Walsh / JD Electrical
Clayton Hotel
- Client: Portland Street Property Ltd
- Location: Manchester
-
X
- Location: Manchester
- Contract: JCT2016 Design & Build
- Architect: Stephenson Studio / Leach Rhodes Walker
- Engineer: WSP
- M&E: Ridge & Partners
Crosshalls Building
- Client: Vita Student Living
- Location: Crosshall Street, Liverpool
-
X
- Location: Crosshall Street, Liverpool
- Contract: Unamended JCT 2011 Design & Build
- Completion: September 2014
- Architect: Neil Collins Homes
- Engineer: BDI Structures